Search
  • intelligent cpf banner pc

    Intelligent Central Processing Facilities Solution

    Unstaffed/Least-staffed operations for higher operational
    efficiency of CPFs

Overview

  • Overview
  • Benefits
  • Architecture
  • Products
  • Resources

Benefits

Deployment Automation

Wellsite edge autonomy

• Response time for exceptions: 6 hours → 1 minute
• Production planning with a dynamometer card: 7% decrease in metering deviation of production in a single well
• Smart pitching: inspection time: days → minutes
• Intelligent dosing: operation time: days → minutes

Safety and environmental protection

• Safety supervision: Identification accuracy, such as detecting evaporation, emissions, leaks, or drips, can reach up to 80%.
• Intelligent well start-up: Reduce manual intervention and reduce accidents.

085 ronghe

One-click device status inspection

• Device discovery period: 1 day → 10 minutes
• Inspection time: 1 day → 10 minutes
• Onsite maintenance workload reduced by 50%

Products

Resources

TOP