Research institute enhances its computing resource

Total: 0 Products

  • Choose product to compare

Huawei

Cancel
Compare with CISCO
Compare with H3C
  • Choose product to compare

Huawei

Cancel
Compare with CISCO
Compare with H3C
  • Choose product to compare

Huawei

Cancel
Compare with CISCO
Compare with H3C
  • Choose product to compare

Huawei

Cancel
Compare with CISCO
Compare with H3C

Research institute enhances its computing resource

With growing demands for more processing power, the Albert Einstein Institute needed to find a cost-effective solution to upgrade its world-leading Atlas computing cluster

Background

The Max Planck Institute for Gravitational Physics, also known as the Albert Einstein Institute (AEI), was founded in 1995 for the purpose of carrying out research into the fundamental laws of gravitation. As part of this, its Observational Relativity and Cosmology (ORC) division, based in Hannover, Germany, is focused on the direct observational consequences of Einstein’s General Theory of Relativity, and its relationship to astrophysics and cosmology.

This work is very compute-intensive and its success is highly dependent on the amount of computing power available to process the observational data. For this reason, one of the central activities of the ORC team is to maintain and increase the group’s computing resources. Its main responsibility is to manage the Atlas computing cluster, the world’s largest and most powerful resource dedicated to gravitational wave searches and data analysis.

Challenges

It’s vital that the power of Atlas is not only maintained, but can be easily expanded to handle the increasing requirements of the data analysts using it. Dr. Henning Fehrmann, Cluster Administrator, AEI ORC explains:

“The work our scientists carry out is very detailed and is built on highly complex special algorithms which need immense amounts of computing power to run. With the second stage of an important project about to start, we were asked to increase the capacity of Atlas so it could be completed successfully.”

As with any publicly funded body, the ORC team also has to work to a very tight budget. As such, it is very aware of being accountable for what it spends and the need to demonstrate value for money in any purchase it makes. With this in mind, a public tender was issued to find a solution that would best meet its requirements in terms of both price and performance.

Solution

Several responses were received proposing solutions built on equipment from various leading vendors. Each was evaluated against a list of pre-defined requirements with the Huawei solution, offered by IT distributor Go Virtual, standing out as the one that most closely met what it was looking for.

The Huawei FusionServer RH1288 V3 is a general-purpose rack server designed to support a range of data intensive applications. It features high-performance computing (HPC), large storage capacity, low power consumption, with high scalability and reliability, and is easy to manage and deploy.

Its small size means that double the computing capacity can be housed in a conventional rack, potentially saving up to 50 per cent in location costs.

“We knew that the on-going running costs of the new servers was also an important factor for AEI. With a combination of very energy-efficient power supply units and simple management and maintenance, the FusionServer more than meets this need,”

Dr. Hans-Joachim Hinz, Go Virtual

Go Virtual completed the installation of the solution in three phases and everything went to plan. A few minor problems were experienced but they were dealt with quickly. The Huawei support team provided support every step of the way, from the initial architecture design through to final commissioning.

Benefits

“The cluster extension with the new machines has allowed us to double the overall computing power of Atlas and has significantly improved our ability to perform follow-up analyses of gravitational wave signals.

“We are very happy with the way everything has worked and are impressed with the professional support we have received. The free software for CMOS and BMC management has been an added bonus,” concludes Dr. Henning Fehrmann.

This case study first appeared in Storage Insider.

About Huawei Enterprise Business Group

Huawei Enterprise Business Group (“Huawei Enterprise”) is one of the three business groups of Huawei, a leading global Information and Communications Technology (ICT) solutions provider. Leveraging Huawei’s strong R&D capabilities and comprehensive technical expertise, Huawei Enterprise provides a wide range of highly efficient customer-centric ICT solutions and services to global vertical industry and enterprise customers across government and public sector, finance, transportation, electric power, energy, commercial businesses, and ISPs.

Huawei Enterprise’s innovative and leading solutions cover network infrastructure, Unified Communications and Collaboration (UC&C), cloud computing and data center, enterprise information security, and industry application solutions.

For more information, please visit: e.huawei.com/uk

About Albert Einstein Institute

The Max Planck Institute for Gravitational Physics, also known as the Albert Einstein Institute, was founded in 1995 by the Max Planck Society for the purpose of carrying out research into the fundamental laws of gravitation. Its Observational Relativity and Cosmology (ORC) division, based in Hannover, Germany is focused on the direct observational consequences of Einstein’s General Theory of Relativity, particularly as it relates to astrophysics and cosmology.

For more information, please visit: aei.mpg.de

About Go Virtual

Go Virtual is a distributor of Hardware and Software designed to support solutions for CFD, Visualization and High-Performance Computing. It has three offices in Europe, located in Gothenburg, Stockholm and Ratingen (close to Düsseldorf) and works with clients across Europe.

The company designs and integrates supercomputers streamlined to accelerate virtual development and recently received Huawei’s Best Project Delivery Award for IT Services. Through well-built computing solutions, it aims to equip its customers with more data, less prototypes, and better problem-solving capacity.

For more information, please visit: govirtual.eu

0 readers

(0 scores)

Like the story? Give your score.

0/500

Write your comment here.