This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Need Help?

Updates

    Huawei Synlock® T8010 II

    The T8010 II meets the high-accuracy time and clock synchronization requirements of service equipment for a range of IP transmission network environments and scenarios.

    The T8010 II provides precise time synchronization for 5G solutions and IP precise time synchronization for TD-SCDMA/CDMA2000/WiMAX TDD/LTE TDD/LTE-A solutions, frequency synchronization for GSM/WCDMA/WiMax FDD/LTE FDD solutions as well as SDH and SyncE networks. The T8010 II also provides low precise time synchronization of Network Time Protocol (NTP) for signaling, bill, and network management.


    Specifications

    Item Synlock® T8010 II
    Dimensions (H x W x D) 88.1 mm x 442 mm x 223.5 mm (2U high)
    GNSS Input
    • One GPS/Beidou/GLONASS satellite input (two are planned for the future)
    Frequency Sync Input One 1 PPS/10 MHz input (two in the future). One E1/2.048 MHz input (at least four are planned for the future)
    Frequency Sync Output One 1 PPS/10 MHz output for testing (two are planned for the future). 32 E1/2.048 MHz outputs per board, supports at most five E1/2.048 MHz boards, Rubidium configuration, or six boards, and OCXO configuration. Two GE optical PTP (G.8265.1) or SyncE ports, at least eight GE/10 GE optical PTP/SyncE ports per Ethernet interface board and supports at most five boards, Rubidium configuration (six boards and OCXO configuration are planned for the future)
    Frequency Sync Accuracy Lock to GNSS: 1-12/day Holdover (Rubidium): 4-12/day, 5-11/month Holdover (OCXO): 2.5-10/day, 5-9/month
    Time Sync Input
    • One 1 PPS + TOD (at least four planned for the future)
    Time Sync Output Two GE optical PTP (G.8275.1)/NTP ports, at least eight GE/10 GE optical PTP/SyncE ports per Ethernet interface board and supports at most five boards, Rubidium configuration (six boards and OCXO configuration are planned for the future). Two GE/FE electrical NTP ports (at least eight are planned for the future). One 1 PPS + TOD (at least four are planned for the future).
    Time Sync Accuracy Lock to GNSS: < 30 ns/day Holdover (Rubidium): 1 us/2 days Holdover (OCXO): 5 us/day
    Temperature
    • -5°F to +55°F (long-term)
    Power Supply
    • DC: –48V

    For Partners

    Are you a Huawei partner? Log in to see additional resources. Looking for a solution from a Huawei partner? Connect with our partner ecosystem.

    WORLDWIDE

    Huawei Enterprise APP

    Copyright © 2019 Huawei Technologies Co., Ltd. All rights reserved.